Scared Goose Entertainment
Shoot days · Prep · Post · Key dates

How many shoot days?

Put in your page count and budget and see how many days your script needs, how long prep and post should run, and when you'd deliver. The rule of thumb a line producer uses before the breakdown.

Work it out →
01

Your script

What's in the script
Shoot days
0

PrepShootPost

Schedule

Pages a day
Prep (production office)
Shoot
Post to first delivery
Prep to delivery
Cost your crew for these weeks →

A rule of thumb, not a schedule. Real shoot days come from a scene-by-scene breakdown, and cast availability, turnaround and locations all move the number.

02

How it's worked out

How many pages a day can you shoot?

Less than you'd think depends on the budget. The UK independent features we've scheduled, from under £2m to around £15m, all shot between three and four pages a day, mostly over five-week shoots of 24 to 29 days. Micro-budget films push past four; bigger films buy more coverage and set-ups rather than shooting much slower. The calculator starts from those real averages and slows down a little for each thing that eats time on set.

What slows a shoot down?

Children (UK law limits their hours on set), night shoots, stunts and action, period settings, visual effects plates, animals and vehicles, water work, and lots of company moves between locations. A contained, dialogue-driven script set in a few locations goes faster.

How long should prep be?

The production office usually starts at least four weeks before the shoot, and longer for bigger shoots. Heads of department come on in stages: the production designer and location manager earliest, most of the crew in the last two or three weeks.

How long does post-production take?

Longer than most people plan for. On the UK features we've run, picture lock came about 13 weeks after wrap, and the first master delivery 26 to 33 weeks after wrap: six to eight months. Heavy visual effects, a big score or a Christmas break push it out further. The editor normally starts assembling during the shoot.

Is this a real schedule?

No. It's a rule of thumb for planning and financing. A real schedule comes from breaking the script down scene by scene: cast availability, locations, day and night, and turnaround all change the number.

03

Make it real

i

UK budget & schedule

A full shooting schedule and UK budget for your script, broken down scene by scene by a working line producer, with the tax relief worked out line by line. £3,000, details here, or send us your script.

ii

UK Feature Budget Template 2027

Put your weeks into a ready-to-use Excel budget with fringes, a 2027 crew rate guide for Scotland and the UK regions, and AVEC and IFTC estimates on the Top Sheet. £149 including VAT, instant download.

iii

Free calculators

What your crew really cost, and how much of your budget comes back as UK tax relief.

Buy the template · £149Secure checkout by Stripe